http://skincarerx.com |
Monday, April 30, 2012
Clarisonic Mia (Pink)
Saturday, April 28, 2012
Subsequent addition to the family - Squeaky & Nami
We thought of adopting another male hamster as a playmate to Fly ever since we observed that he gets quite depressive sometimes.
I stalked Singapore Hamsters Club everyday and finally adopted 2 hamsters from a forum user.
We actually only wanted just 1 hamster but the owner preferred both to be adopted together.
After discussing with HIM, we decided to just go ahead with the adoption which lead to a series of unfortunate events!
Instead of just 1 hamster, we adopted 2...
These supposed-to-be-male hamsters as assured by the owner turned out to be FEMALES...
These 2 hamsters which were cohabiting in peace previously started fighting when introduced into their new cage...
Seriously, the situation almost got out of control.
We did not get the playmate for Fly as we intended...
Instead of just preparing 1 cage, we had to setup 2 cages...
Anyway, these 2 hamsters are much more fierce as compared to Fly.
Introducing the tamer 1 - Squeaky which will squeak when she is feeling threatened.
Next is Nami which is like a watch dog. Always on the alert!
They are starting to grow on us though.
Our first activity once we get home is to check on them and 'play' with them for at least a few minutes before carrying on with other activities.
Although having 3 hamsters in 3 cages is more than what we had bargained for, the pleasure and laughter we get from them is all worth it!
Saturday, April 14, 2012
New addition to the family - Fly
Tuesday, September 27, 2011
Scanteak - Negative review
Imagine our horror when we realized 2 of the dining chairs are obviously used goods (worn leg undersides, chipped legs, one leg of a chair had even split apart from the seat area).
Update: The deliveryman claimed that these chairs were actually meant to be delivered to the warehouse but were mistakenly delivered to us...
Monday, September 19, 2011
Installation of lights
Location: Entrance of master bedroom |
Location: Studyroom |
Wednesday, September 14, 2011
Are you sure the unit is really ready for handover? Part III
Called the Bangladeshi supervisor who is supposed to be in charge of rectifying our unit's defects this afternoon.
And got the reply which I had already anticipated....
The defects on our laminated flooring is still yet to be rectified.
From 9 Sept to 10 Sept to 13 Sept and still nothing was done.
When we handed over the keys on Sat, he promised 3-4 days is all he need to clear the remaining defects.
Thus, we decided that Friday would be the deadline.
Perhaps this is why he said laminated flooring will only be rectified on Friday.
As for the rest of the defects, he mentioned that they are currently cleaning up the unit.
*Faint*
Am I supposed to call him up every single day just to check on the defect status?
Starting to feel like a loanshark...
Anyway I guess I have no choice but to do so since HE will only be back on Fri and it is up to me to ensure that things do progress smoothly for us to start painting on Saturday.
*Gambate*
Hope things are progressing more smoothly for the rest of my neighbours.
Cafe Epicurious @ The Rail Mall
Visited Cafe Epicurious located at the Rail Mall quite some time back on a weekday for lunch.
It was quite surreal and windy.
A nice place to relax and enjoy the food.
I had the beef stew while he had the carbonara.
Both dishes were cheap and good.
Definitely will be coming back in the near future.
Monday, September 12, 2011
Are you sure the unit is really ready for handover? Part II
Not sleeping well for the past 1 week.
Kept worrying about the house whether can the defects be rectified by this week so that we can finally start painting.
Was really irritated at the supervisors.
Imagine taking leave to come down to the unit early for defect inspection but they take their own sweet time to turn up.
No sight of them at all from 1000 hrs to 1700 hrs despite numerous calls and smses.
They seemed to think that they are the only busy persons in the whole wide world and the rest of us are just shaking legs *Argh*
The workers who are actually the ones rectifying the defects are so much better in comparison.
So far we are super happy with the workmanship of the rectified defects.
The Chinese worker 'trimmed' numerous tiles for us just to get a perfect piece to replace our chipped tile.
Another Chinese worker who was repairing the chipped/dented/ wall was also very professional.
We thought he would only 'putty' the affected areas but we were wrong.
He even sandpapered the region after the putty had dried, resulting in super smooth surfaces.
Hopefully the rest of the defects will be rectified by Fri as promised by the Bangladeshi supervisor.
If not, he is definitely going to get it from me since he is the one who promised to finish in 3-4 days and we have given him close to a week.
Thursday, September 8, 2011
Are you sure the unit is really ready for handover?
Pretty stunned at the state that the unit is in and keys were still handed over to us.
I don't think that we are very picky but look at this....
Are we supposed to install this ourselves?
And this is just the drain hole under the kitchen sink.
Imagine the same for all drain holes in the unit.
Who is going to be held responsible if someone gets injured?
The cement unfinished surfaces are super rough lo...
As for the bomb shelter, there are missing ventilation covers.
Starting we are quite noob at all these defects checking but I seriously think that we are now quite expert at spotting defects...
Other things like dents/holes on the walls and cement/paint stains, we can still close 1 eye and omit it from the defect list.
Just hope they fix the defects asap *sigh
Sunday, September 4, 2011
Success finally!
Made an impromptu decision to stop by PC and we managed to get into our unit!
It was quite an exciting experience getting from the carpark to the lift and finally into the unit.
Was expecting someone to stop us at any moment.
It was super windy and the scenery was not too bad from various spots in the unit.
Going to do away with the idea of installing ceiling fan, taking into account that the ceiling is really quite low.
Did some defect checking in the dark and so far so good.
Hope that things still look that optimistic in daylight.
On the downside, there seems to be a lack of privacy at certain spots in the unit.
Have to get some window films or curtains installed before shifting in...
Monday, August 29, 2011
Cameron Highlands
Thursday, August 18, 2011
The bad thing about some Taiwanese dramas... 爱上查美乐... 犀利人妻...
One bad thing about some of the Taiwanese drama I am watching is that there are always third parties...
Usually it is the most innocent/unattractive looking guy that attracts the attention of the young & pretty third party.
I might be too emotional but such scenes always make me feel sad for the wife/girlfriend which are not necessary lousy.
Perhaps it is just that they might not be paying much attention towards maintaining their appearance.
What makes it even more sad is that their lives usually evolves around these 'innocent/unattractive looking' guys and they are always the last to find out about these incidents.
Luckily there is always a Prince Charming in the pipeline!
Saturday, August 13, 2011
Where is our letter... Where are our keys...
http://cpeng10.acsd.wikispaces.net |
Tuesday, August 9, 2011
Our new clock!
Bought this nice black clock in Malacca for RM 59.90.
It was love at 1st sight for me.
Somehow I knew it will fit in nicely with our Scanteak loots and didn't bother consulting him at all =>
There were white/red/black versions.
Was deciding between white and black.
The clock design seems so scandinavian with its simple clean lines.
Although our main design for the living is supposed to evolve around the minimalist theme but it seems to be shifting towards 'woody' style with the amount of Scanteak items that we have accumulated over the months.
Might spray paint certain numerals on the clock to a different colour, eg: baby pink/blue?
Thursday, August 4, 2011
Shiseido Aqualabel Review
Tuesday, August 2, 2011
Sneaking into Park Central – Commando style Part II
Friday, July 29, 2011
The Wonder of Evening Primrose Oil
http://www.abbeyessentials.co.uk |
Tuesday, July 26, 2011
Cockroaches are my new "best" friends...
speedysigns.com |
Saturday, July 23, 2011
Tentative sequence of events once we get the keys...
Getty Image |
Thursday, July 21, 2011
Checking of Defects...
Since the collection of keys is going to come by very soon, I guess it is time to dig out the HDB defects checklists provided by online by some kind soul (refer to http://diva79.blogspot.com/2008/03/hdb-defects-checklist.html).
As stated on HDB website, flat owners should inspect their new flat upon collection of keys.
They should report any defects that may be found in the flat within 7 days of receiving the keys or before commencement of any renovation work.
And it seems like if there are indeed any rectification works to be done by HDB, keys will be held by HDB and we wont be able to carry out any renovation works =<
Refer to http://www.hdb.gov.sg/fi10/fi10321p.nsf/w/BuyingNewFlatDefectsInYourNewHome?OpenDocument for more information.
Hope that there is no major faults with the unit and we are able to shift in asap!
Wednesday, July 13, 2011
Sneaking into Park Central - Commando style?
Seriously the wait to getting our keys is driving us nuts...
One last item on the To Buy List - Fridge which we dare not commit due to the not-so-confirmed site measurements.
This is like the slowest flat construction project I have ever seen so far.
Usually BTO/DBSS are completed 1 year before the TOP date but not for Park Central which TOP in Dec 2011...
Anyway the wait kind of drove us to desperate acts like attempting to sneak into the site/our unit to take measurements of the fridge area.
So far, we have only scout out the void deck/carpark area trying to siam the Indian construction workers cum security guards...
There was a good moment whereby HE could have just got into the staircase safely without me but once we hesitate, the chance was lost...
I really have to applaud these workers' perseverance in keeping their work site stranger-free to the extent that they even tail strangers to make sure that they really stay away from PC =O
Friday, July 8, 2011
Shocking Number of Bodies found recently
I am pretty shocked at the amount of bodies found in the recent weeks.
05 Jul 2011 - Decomposed body found at Clementi Woods Park
03 July 2011 - Male body found in waters off Harbourfront Walk
02 July 2011 - Human skeleton found at New Upper Changi Road next Tanah Merah MRT station
01 July 2011 - Female body found in water below Helix Bridge
Hope these incidents are isolated cases and not some serial killer at work.
Thursday, July 7, 2011
GSS Loots - Bedsheets & Down Duvet
http://www.followsales.com |
Sliding Kitchen Door - Not achievable?
According to 1 ID which we emailed for quotation, it is not possible to install a sliding kitchen door due to the limited wall width outside the kitchen opening.
This was his exact reply: "Not possible for sliding door as the wall beside is shorter than kitchen entrance width. Can consider a wooden bi-folding door in laminate/ glass finishing $900 (size:W3ftxH7ft). "
What he brought up did make sense especially after looking at the latest 4 room drawing uploaded at the forum.
Perhaps it is time to shelf the plan...
Save cleaning/wiping time.
Save $ which is very important since I have been shopping like mad this GSS.
Sunday, July 3, 2011
GSS Loots - Bosch Washer WAS28448ME
http://www.bosch-home.com |
Thursday, June 30, 2011
GSS Loots - Sony KDL40EX520
sony.com.sg |
Wednesday, June 8, 2011
Scanteak Loots!
Ladder Book Shelf |
Athos 120 cm TV Bench |
Lois Dining Set |
Friday, June 3, 2011
TOP date to AMK Park Central
Wondering when will we ever get the keys?
Expected TOP is supposed to be Dec 2011.
Based on normal HDB standards, owners usually get the keys 1 year ahead of TOP date but this is not the case for us!
Expected an earlier completion date of around June this year but seems like it is just wishful thinking.
There are news from the developer that our block can get only the keys in Aug.
Faintz.
I just want to get the keys/floorplan asap so that I can know whether can I get a king-sized bed anot.
This is like the most important item on my To-Get List.
I want to buy my bedsheets etc lo.
Wish us luck!